DemoContract manufacturer, 120 staff
Ridgeway Precision Components
Three production lines, quality checks against tolerance, and specs with revisions.
Walk through
- Line 2 slows down and the cause is found
- A check drifts out of tolerance and the lot goes on hold
- A customer asks for a tolerance change and Rev C is released
Foundry (production) · Gauge (quality) · Blueprint (specs)